Hazardous Waste Recycling
On going work at this facility has included the design and upgrade of
various process control systems to include a 55 gallon drum decant
system, hazardous waste shredding system and a facility tank level
monitoring system. PLC's used at the site include both Allen-Bradley and
Square D with operator interfaces via Allen-Bradley Panelviews and
Intellution software. Additional work has
included AutoCad drawing conversions of hand drawings, parts procurement,
development of a Subpart BB emission database, and revisions to
the site P&ID's to accommodate inclusion of equipment into a Maintenance
database. Nearly 60 projects have been performed since 1996.
Typical projects include engineering, programming, and
site startup.
|